(Summary description)A. Classified by foundation: table foundation (including pile foundation cap), weight foundation, track walking foundation
B. Classification according to the rotation arrangement: lower rotary type, upper rotary type
C. Classified by luffing method: boom luffing type, trolley luffing type
Common sense of safe use of tower crane
(Summary description)A. Classified by foundation: table foundation (including pile foundation cap), weight foundation, track walking foundation
B. Classification according to the rotation arrangement: lower rotary type, upper rotary type
C. Classified by luffing method: boom luffing type, trolley luffing type
- Categories:Industry News
- Author:
- Origin:
- Time of issue:2020-07-09
- Views:0
1. Basic knowledge of tower crane
1. Tower crane classification:
A. Classified by foundation: table foundation (including pile foundation cap), weight foundation, track walking foundation
B. Classification according to the rotation arrangement: lower rotary type, upper rotary type
C. Classified by luffing method: boom luffing type, trolley luffing type
D. Classified by tower cap structure: with tower cap type and without tower cap type
2. The basic structure of the tower crane (upper swing trolley type):
a, foundation, b, tower body, c, jacking frame, d, slewing mechanism (including transition section),
E, balance arm (including counterweight, hoisting mechanism), f, lifting arm (including trolley luffing mechanism),
G, electrical system (including safety devices)
3. Common parameters of tower crane:
A, lifting weight
B, lifting moment
C, coverage
D, maximum installation height (independent height, attachment height and maximum overhang height)
4, the key points of tower crane selection:
A. According to the requirements of the shape and characteristics of the building: the maximum installation height of the tower crane should meet the height requirements of the building, and the plane size determines the length of the tower crane's boom and the installation location of the tower crane. Tower crane installation position The shape characteristics of the building facade determine the installation position, installation and disassembly plan and other operational requirements
B. According to the requirements of the surrounding environment of the installation location: the independent installation height of the tower crane should exceed the height of the surrounding existing buildings
C. According to the requirements of the maximum single piece weight of the hoisted article during the construction process: determine the maximum lifting weight of the tower crane and the lifting weight of the corresponding range (tower crane lifting moment). In particular, consideration should be given to meeting the capacity of steel bar bundle unloading at the parking position of the steel bar transport vehicle.
D. According to the structural characteristics of the building:
5. Key points of tower crane layout:
A, meet the requirements of plane coverage (at the same time, no interference with existing buildings, no interference between towers)
B. Meet the structural requirements of the internal buttress wall at the construction height of the building
C. Avoid the installation location of the construction elevator. (Before arranging the tower crane, the construction elevator should be arranged first to ensure that the elevator transportation channel is unblocked.)
D. As far as possible to meet the space requirements of conventional tower crane demolition, if special demolition is necessary, reasonable arrangements should be made in conjunction with all parties to reduce the difficulty of demolition.
7. Information that should be available when using tower crane:
Information that should be available when using tower crane
One, instruction manual
2. Equipment production license
3. Equipment production license details
Four, tower crane product certificate (with test report) (factory certificate)
5. Provincial filing certificate
VI. Tower crane foundation groove inspection record
Seven, tower crane foundation construction plan with calculation book
8. Basic steel bar material certificate
Nine, basic hidden information
10. Concrete strength report
11. Installation, dismantling, and jacking-up wall attachment plan
12. Installation qualification and safety license of installation unit
13. Operator's post certificate
Fourteen, job safety technical details
15. Installation process record
16. Self-check report after installation
17. Application for inspection permit
18, the use of tower crane safety technology clarification
19. Tower crane operating procedures (including operation and maintenance, maintenance procedures, standards)
Twenty, tower crane "ten not hang"
21. Tower crane operation record, shift record, inspection and maintenance record
22. Verticality measurement record
Twenty-three, tower crane use inspection, rectification records
24. External power protection measures
25. Anti-collision measures for group tower operations
3. The special plan for tower crane installation should include the following
1. Project overview
2, installation location plan and elevation
3, the selected tower crane model and performance technical parameters
4. Setting of foundation and wall attachment
5. Climbing condition and attachment device node diagram
6. Installation sequence and safety and quality requirements
7, the weight of the main installation parts and the position of the lifting point
8. Type, performance and arrangement location of installation auxiliary equipment
9. Power setting
10. Configuration of construction personnel
11. Configuration of slings and special tools
12, installation process program
13. Debugging of safety devices
14. Major hazards and safety technical measures
15, emergency rescue plan, etc.
Scan the QR code to read on your phone
Recommend
- Management requirements for daily use and maintenance of tower cranes 2020.07.09
- Common sense of safe use of tower crane 2020.07.09
- Daily maintenance knowledge of tower cranes 2020.07.09
- Basic knowledge of tower crane 2020.07.09
CONTACT
Phone:13982288802(Mr. Yang)
Tel:028-82482136
Mail:1125286921@qq.com
Add:No. 39, Group 3, Gonghe Village, Huayuan Town, Xinjin County, Chengdu City, Sichuan Province

Website QR Code
SHARE
- TEL +8613982288802
- TOP
Copyright © 2020 Zhongtian Haoye Machinery. All rights reserved. 蜀ICP备150689875号